The Air Traffic Flow Management Problem with Enroute Capacities
Published Online:1 Jun 1998https://doi.org/10.1287/opre.46.3.406
References
- , Bianco L., Odoni A. R. Models for the ground-holding problem. Large-Scale Computation and Information Processing in Air Traffic Control (1993) (Springer-Verlag, Berlin) Crossref, Google Scholar
- Personal Communication. (1993) Google Scholar
- Computers and Intractibility: A Guide to the Theory of NP-Completeness (1979) (W. H. Freeman & Company, New York) Google Scholar
- Airport capacity: Representation, estimation, optimization. IEEE Trans. Control Systems Tech. (1993) 1(3):144–154Crossref, Google Scholar
- Reducing air traffic delay in a space-time network. Proc. 1992 IEEE Internat. Conf. Systems, Man and Cybernetics (1992) (Chicago)236–242Crossref, Google Scholar
- Traffic flow management modeling with the time assignment model. Air Traffic Control Quart. (1993) 1:3Crossref, Google Scholar
- Integer and Combinatorial Optimization (1988) (John Wiley & Sons, New York) Crossref, Google Scholar
- , Odoni A. R., Szego G. The flow management problem in air traffic control. Flow Control of Congested Networks (1987) (Springer-Verlag, Berlin) Crossref, Google Scholar
- Solving optimally the static ground-holding policy problem in air traffic control. Transportation Sci. (1993) 27:228–238Link, Google Scholar
- Dynamic solution to the ground-holding policy problem in air traffic control. Transportation Res. (1994) 28a:167–185Google Scholar
- Strategic flow control on an air traffic network. Opns. Res. (1993) 41:138–152Link, Google Scholar
- Dynamic strategic and tactical air traffic flow control. (1993) . RPI Technical reportGoogle Scholar
- The multi-airport ground-holding problem in air traffic control. Opns. Res. (1994a) 42:249–261Link, Google Scholar
- Dynamic ground-holding policies for a network of airports. Transportation Sci. (1994b) 28:275–291Link, Google Scholar
- Austere future looms for F.A.A.. New York Times (1995) October 15):A1Google Scholar

