Stationary Policies in Multiechelon Inventory Systems with Deterministic Demand and Backlogging

Published Online:https://doi.org/10.1287/opre.46.3.S26

References

  • Atkins D. , Iyogun P. A lower bound on a class of coordinated inventory/production problems. O. R. letts. (1987) 6 63 67 CrossrefGoogle Scholar
  • Atkins D. , Queyranne M. , Sun D. Lot sizing policies for finite production rate assembly systems. Opns. Res. (1992) 40 126 141 LinkGoogle Scholar
  • Atkins D. , Sun D. 98%-effective lot sizing for series inventory system with backlogging. Opns. Res. (1995) 43 335 345 LinkGoogle Scholar
  • Axsater S. , Graves S. , Rinnooy Kan A. , Zipkin P. Continuous review policies for multi-level inventory systems with stochastic demand. Handbook in Operations Research and Management Science. Vol. 4, Logistics of Production and Inventory. (1993) (North-Holland) CrossrefGoogle Scholar
  • Chen F. Stationary policies in multi-echelon inventory systems with deterministic demand and backlogging. (1994a) . Unabridged Working paper, Graduate School of Business, Columbia University, New York Google Scholar
  • Chen F. 94%-effective policies for a two-stage series system with stochastic demand. (1994b) . Working paper, Graduate School of Business, Columbia University, New York Google Scholar
  • Federgruen A. , Graves S. , Rinnooy Kan A. , Zipkin P. Centralized planning models for multi-echelon inventory systems under uncertainty. Handbook in Operations Research and Management Science. Vol. 4, Logistics of Production and Inventory (1993) (North-Holland) CrossrefGoogle Scholar
  • Federgruen A. , Queyranne M. , Zheng Y.-S. Simple power of two policies are close to optimal in general class of production/distribution networks with general joint setup costs. Math. O. R. (1992) 17 951 963 LinkGoogle Scholar
  • Federgruen A. , Zheng Y.-S. The joint replenishment problem with general joint cost structures. Opns. Res. (1992) 40 384 403 LinkGoogle Scholar
  • Jackson P. , Maxwell W. , Muckstadt J. The joint replenishment problem with a powers of two restriction. AIIE Trans. (1985) 17 25 32 Google Scholar
  • Maxwell W. , Muckstadt J. Establishing consistent and realistic reorder intervals in production-distribution systems. Opns. Res. (1985) 33 1316 1341 LinkGoogle Scholar
  • Mitchell J. 98%-effective lot-sizing for one-warehouse multi-retailer inventory systems with backlogging. Opns. Res. (1987) 35 399 404 LinkGoogle Scholar
  • Muckstadt J. , Roundy R. , Graves S. , Rinnooy Kan A. , Zipkin P. Analysis of multistage production systems. Logistics of Production and Inventory (1993) (North-Holland) CrossrefGoogle Scholar
  • Roundy R. 98%-effective integer-ratio lot-sizing for one-warehouse multi-retailer systems. Management Sci. (1985) 31 1416 1430 LinkGoogle Scholar
  • Roundy R. 98% effective lot-sizing rule for a multi-product, multi-facility production-inventory systems. Math. O. R. (1986) 11 699 727 LinkGoogle Scholar
  • Schwarz L. A simple continuous review deterministic one-warehouse multi-retailer problem. Management Sci. (1973) 19 555 566 LinkGoogle Scholar
  • Sun D. , Atkins D. 98%-effective lot-sizing for assembly inventory systems with backlogging. Opns. Res. (1997) 45 940 951 LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.