A Dynamic Model for Requirements Planning with Application to Supply Chain Optimization

Published Online:https://doi.org/10.1287/opre.46.3.S35

References

  • Baker K. R. , Graves S. C. , Rinnooy Kan A. H. , Zipkin P. H. Requirements planning. Handbooks in Operations Research and Management Science, Vol. 4, Logistics of Production and Inventory (1993) (North-Holland, Amsterdam) Google Scholar
  • Fine C. H. , Graves S. C. A tactical planning model for manufacturing subcomponents in mainframe computers. J. Manuf. Opns. Management (1989) 2 1 4 34 Google Scholar
  • Graves S. C. , Meal H. C. , Dasu S. , Qiu Y. , Axsäter S. , Schneeweiss C. , Silver E. Two-stage production planning in a dynamic environment. Multi-Stage Production Planning and Inventory Control (1986) 266 (Springer-Verlag, Berlin) 9 43 . Lecture Notes in Economics and Mathematical Systems CrossrefGoogle Scholar
  • Graves S. C. A tactical planning model for a job shop. Opns. Res. (1986) 34 4 522 533 LinkGoogle Scholar
  • Graves S. C. Safety stocks in manufacturing systems. J. Manuf. Opns. Management (1988a) 1 1 67 101 Google Scholar
  • Graves S. C. Determining the spares and staffing levels for a repair depot. J. Manuf. Opns. Management (1988b) 1 2 227 241 Google Scholar
  • Graves S. C. Extensions to a tactical planning model for a job shop. Proc. 27th IEEE Conf. Decision and Control (1988c) December Austin, Texas CrossrefGoogle Scholar
  • Graves S. C. A multiechelon inventory model with fixed replenishment intervals. Management Sci. (1996) 42 1 18 LinkGoogle Scholar
  • Heath D. C. , Jackson P. L. Modeling the evolution of demand forecasts with application to safety stock analysis in production/distribution systems. IIE Trans. (1994) 26 3 17 30 CrossrefGoogle Scholar
  • Hetzel W. B. Cycle time reduction and strategic inventory placement across a multistage process. (1993) . MIT Master's thesis Google Scholar
  • Jackson P. L. Stock allocation in a two-echelon distribution system or “What to do until your ship comes in.”. Management Sci. (1988) 34 7 880 895 LinkGoogle Scholar
  • Karmarkar U. S. , Graves S. C. , Rinnooy Kan A. H. , Zipkin P. H. Manufacturing lead times, order release and capacity loading. Handbooks in Operations Research and Management Science, Vol. 4, Logistics of Production and Inventory (1993) (North-Holland, Amsterdam) CrossrefGoogle Scholar
  • Kletter D. B. Proofs of P8 and P9. (1994) . Technical Appendix Google Scholar
  • Lee H. L. , Billington C. Material management in decentralized supply chains. Opns. Res. (1993) 41 5 835 847 LinkGoogle Scholar
  • Schwarz L. B. A model for assessing the value of warehouse risk-pooling: Risk-pooling over outside-supplier leadtimes. Management Sci. (1989) 35 828 842 LinkGoogle Scholar
  • Simpson K. F. In-process inventories. Opns. Res. (1958) 6 863 873 LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.