Resource Constrained Chain Scheduling of UET Jobs on Two Machines
Published Online:1 Oct 1998https://doi.org/10.1287/opre.46.5.742
References
- Scheduling Under Resource Constraints: Deterministic Models (1987) (J. C. Baltzer, Basel, Germany) Google Scholar
- Scheduling in Computer and Manufacturing Systems (1993) (Springer Verlag, Berlin and New York) Crossref, Google Scholar
- Scheduling subject to resource constraints: Classification and complexity. Discrete Appl. Math. (1983) 5 11 24 Crossref, Google Scholar
- Optimal sequencing of two equivalent processors. SIAM J. Appl. Math. (1969) 17 784 789 Crossref, Google Scholar
- Complexity results for multiprocessor scheduling under resource constraints. SIAM J. Comput. (1975) 4 397 411 Crossref, Google Scholar
- Optimization and approximation in deterministic sequencing and scheduling theory: A survey. Ann. Discrete Math. (1979) 5 287 326 Crossref, Google Scholar
- An O(n 2.5) algorithm for maximum matching in general graphs. Sixteenth Annual Sympos. Foundations of Computer Science. IEEE (1975) 100 112 Google Scholar
- (1984) . Unpublished Result Google Scholar
- (1984) . Unpublished Result Google Scholar

