Cramér-von Mises Variance Estimators for Simulations
Published Online:1 Apr 1999https://doi.org/10.1287/opre.47.2.299
References
- Asymptotic theory of certain “goodness of fit” criteria based on stochastic processes. Ann. Math. Statist. (1952) 23:193–212Crossref, Google Scholar
- Convergence of Probability Measures (1968) (John Wiley & Sons, New York) Google Scholar
- A Guide to Simulation (1987) 2nd ed.(Springer-Verlag, New York) Crossref, Google Scholar
- On the composition of elementary errors. Second Paper: statistical applications. Skand. Aktuartidskr. (1928) 11:141–180Google Scholar
- The serial correlation coefficients of waiting times in a stationary single server queue. J. Austr. Math. Soc. (1968) 8:683–699Crossref, Google Scholar
- Distribution Theory for Tests Based on the Sample Distribution Function (1973) (Society for Industrial and Applied Mathematics, Philadelphia, PA) Crossref, Google Scholar
- Parameter Estimation and Hypothesis Testing in Spectral Analysis of Stationary Time Series (1986) (Springer-Verlag, New York) Crossref, Google Scholar
- Confidence intervals using orthonormally weighted standardized time series. (1990) . Technical report, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GAGoogle Scholar
- Simulation output analysis using standardized time series. Math. Oper. Res. (1990) 15:1–16Link, Google Scholar
- , Nelson B. L., Kelton W. D., Clark G. M. Cramér-von Mises variance estimators for simulations. Proc. 1991 Winter Simulation Conf. (1991) (The Institute of Electrical and Electronics Engineers, Piscataway, NJ) 916–920Crossref, Google Scholar
- A comparison of several variance estimators. (1986) . Technical report J-85-12, School of Industrial and Systems Engineering, Georgia Institute of Technology, Atlanta, GAGoogle Scholar
- Properties of standardized time series weighted area variance estimators. Management Sci. (1990) 36:602–612Link, Google Scholar
- New confidence interval estimators using standardized time series. Management Sci. (1990) 36:393–397Link, Google Scholar
- , Krishnaiah P. R. Simple methods for positive-valued and discrete-valued time series with ARMA correlation structure. Multivariate Analysis—V (1980) (North-Holland, New York) 151–166Google Scholar
- , Sheppard S., Pooch U. W., Pegden C. D. Overlapping batch means: Something for nothing? Proc. 1984 Winter Simulation Conf. (1984) (The Institute of Electrical and Electronics Engineers, Piscataway, NJ) 227–230Google Scholar
- The estimation of standard errors in Monte Carlo simulation experiments. Biometrika (1975) 62:1–4Crossref, Google Scholar
- Handbook of the Normal Distribution (1982) (Marcel Dekker, New York) Crossref, Google Scholar
- An investigation of finite-sample behavior of confidence interval estimators. Oper. Res. (1992) 40:898–913Link, Google Scholar
- , MacNair E. A., Musselman K. J., Heidelberger P. Inverse-transformation algorithms for some common stochastic processes. Proc. 1989 Winter Simulation Conf. (1989) (The Institute of Electrical and Electronics Engineers, Piscataway, NJ) 490–496Crossref, Google Scholar
- Confidence interval estimation using standardized time series. Oper. Res. (1983) 31:1090–1108Link, Google Scholar
- Empirical Processes with Applications to Statistics (1986) (John Wiley & Sons, New York) Google Scholar
- On the distribution of the von Mises ω2-Criterion (in Russian). Matem Sbornik. (1937) 5:973–993Google Scholar
- Optimal meansquared-error batch sizes. Management Sci. (1995) 41:110–123Link, Google Scholar
- Wahrscheinlichkeitsrechnung (1931) (Wein, Leipzig, Austria) Google Scholar
- Planning queueing simulations. Management Sci. (1989) 35:1341–1366Link, Google Scholar

