Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs

Published Online:https://doi.org/10.1287/opre.47.3.422

References

  • Allahverdi A., Mittenthal J. Scheduling on M parallel machines subject to random breakdowns to minimize expected mean flow time. Naval Res. Logist. (1994) 41:677–682CrossrefGoogle Scholar
  • Baker K. R., Scudder G. D. Sequencing with earliness and tardiness penalties: A review. Opns. Res. (1990) 38:22–36LinkGoogle Scholar
  • Balut S. J. Scheduling to minimize the number of late jobs when set-up and processing times are uncertain. Management Sci. (1973) 19:1283–1288LinkGoogle Scholar
  • Bayard D. S. Proof of quasi-adaptivity for the m-measurement feedback class of stochastic control policies. IEEE Trans. Automatic Control (1987) 32:447–451CrossrefGoogle Scholar
  • Bertsekas D. P.Dynamic Programming and Stochastic Control (1976) (Academic Press, New York) Google Scholar
  • Birge J., Frenk J. B. G., Mittenthal J., Rinnooy Kan A. H. G. Single-machine scheduling subject to stochastic breakdowns. Naval Res. Logist. (1990) 37:661–677CrossrefGoogle Scholar
  • Blau R. A. N-job, one machine sequencing problems under uncertainty. Management Sci. (1973) 20:101–109LinkGoogle Scholar
  • Blazewicz J., Ecker K. H., Schmidt G., Weglarz J.Scheduling in Computer and Manufacturing Systems (1994) 2nd ed.(Springer-Verlag, Berlin) CrossrefGoogle Scholar
  • Boxma O. J., Forst F. G. Minimizing the expected weighted number of tardy jobs in stochastic flow shops. Oper. Res. Lett. (1986) 5:119–126CrossrefGoogle Scholar
  • Buzacott J. A., Shanthikumar J. G.Stochastic Models of Manufacturing Systems (1993) (Prentice-Hall, Englewood Cliffs, NJ) Google Scholar
  • Cai X. Minimization of agreeably weighted variance in single machine systems. Eur. J. Oper. Res. (1995) 85:576–592CrossrefGoogle Scholar
  • Cai X. V-shape property for job sequences that minimize the expected completion time variance. Eur. J. Oper. Res. (1996) 91:118–123CrossrefGoogle Scholar
  • Cai X., Zhou S. Scheduling stochastic jobs with asymmetric earliness and tardiness penalties. Naval Res. Logist. (1997) 44:531–557CrossrefGoogle Scholar
  • Chakravarthy S. A single machine scheduling problem with random processing times. Naval Res. Logist. Quart. (1986) 33:391–397CrossrefGoogle Scholar
  • Cheng T. C. E. Optimal due-date assignment for a single machine sequencing problem with random processing times. Internat. J. Systems Sci. (1986) 17:1139–1144CrossrefGoogle Scholar
  • Cheng T. C. E. Optimal due-date determination and sequencing with random processing times. Math. Model. (1987) 9:573–576CrossrefGoogle Scholar
  • Coffman E. G., Flatto L., Wright P. E. Optimal stochastic allocation of machines under waiting-time constraints. SIAM J. Comput. (1993) 22:332–348CrossrefGoogle Scholar
  • De P., Ghosh J. B., Wells C. E. On the minimization of the weighted number of tardy jobs with random processing times and deadline. Comput. Oper. Res. (1991) 18:457–463CrossrefGoogle Scholar
  • Derman C., Lieberman G., Ross S. A renewal decision problem. Management Sci. (1978) 24:554–561LinkGoogle Scholar
  • Emmons H., Pinedo M. Scheduling stochastic jobs with due dates on parallel machines. Eur. J. Oper. Res. (1990) 47:49–55CrossrefGoogle Scholar
  • Garey M. R., Johnson D. S.Computers and Intractability: A Guide to the Theory of NP-Completeness (1979) (W.H. Freeman and Company, New York) Google Scholar
  • Gittins J. C.Multi-Armed Bandit Allocation Indices (1989) (John Wiley & Sons, Chichester, England) Google Scholar
  • Glazebrook K. D. Scheduling stochastic jobs on a single machine subject to breakdowns. Naval Res. Logist. Quart. (1984) 31:251–264CrossrefGoogle Scholar
  • Kahlbacher H. G., Cheng T. C. E. Parallel machine scheduling to minimize costs for earliness and number of tardy jobs. Discrete Appl. Math. (1993) 47:139–164CrossrefGoogle Scholar
  • Kampke T. Optimal scheduling of jobs with exponential service times on identical parallel processors. Oper. Res. (1989) 37:126–133LinkGoogle Scholar
  • Karp R. M., Miller R. E., Thatcher J. W. Reducibility among combinatorial problems. Complexity of Computer Computations (1972) (Plenum Press, New York) CrossrefGoogle Scholar
  • Katoh N., Ibaraki T. A polynomial time algorithm for a chance-constrained single machine scheduling problem. Oper. Res. Lett. (1983) 2:62–65CrossrefGoogle Scholar
  • Kise H., Ibaraki T. On Balut's algorithm and NP-completeness for a chance-constrained scheduling problem. Management Sci. (1983) 29:384–388LinkGoogle Scholar
  • Kise H., Ibaraki T., Mine H. A solvable case of the onemachine scheduling problem with ready and due times. Oper. Res. (1978) 26:121–126LinkGoogle Scholar
  • Kise H., Shiomi A., Uno M., Chao D. An efficient algorithm for a chance-constrained scheduling problem. J. Oper. Res. Soc. Japan (1982) 25:193–203Google Scholar
  • Lee C.-Y., Danusaputro S. L., Lin C.-S. Minimizing weighted number of tardy jobs and weighted earlinesstardiness penalties about a common due date. Comput. Oper. Res. (1991) 18:379–389CrossrefGoogle Scholar
  • Lawler E. L. A pseudopolynomial algorithm for sequencing jobs to minimize total tardiness. Ann. Discrete Math. (1977) 1:331–342CrossrefGoogle Scholar
  • Mayne D. Q., Michalska H. Receding horizon control of nonlinear systems. IEEE Trans. Automatic Control (1990) 35:814–824CrossrefGoogle Scholar
  • Mittenthal J., Raghavachari M. Stochastic single machine scheduling with quadratic early-tardy penalties. Oper. Res. (1993) 41:786–796LinkGoogle Scholar
  • Pinedo M. Stochastic scheduling with release dates and due dates. Oper. Res. (1983) 31:559–572LinkGoogle Scholar
  • Pinedo M., Ross S. H. Scheduling jobs subject to nonhomogeneous Poisson shocks. Management Sci. (1980) 26:1250–1257LinkGoogle Scholar
  • Sarin S. C., Erel E., Steiner G. Sequencing jobs on a single machine with a common due date and stochastic processing times. Eur. J. Oper. Res. (1991) 51:287–302CrossrefGoogle Scholar
  • Soroush H. M., Fredendall L. D. The stochastic single machine scheduling problem with earliness and tardiness costs. Eur. J. Oper. Res. (1994) 77:287–302CrossrefGoogle Scholar
  • Tse E., Athans M. Adaptive stochastic control for a class of linear systems. IEEE Trans. Automatic Control (1972) 17:38–51CrossrefGoogle Scholar
  • Vani V., Raghavachari M. Deterministic and random single machine sequencing with variance minimization. Oper. Res. (1987) 35:111–120LinkGoogle Scholar
  • Weber R. On the Gittins index for multiarmed bandits. Ann. Appl. Probab. (1992) 2:1024–1033CrossrefGoogle Scholar
  • Weiss G., Pinedo M. Scheduling tasks with exponential services times on non-identical processors to minimize various cost functions. J. Appl. Probab. (1980) 17:187–202CrossrefGoogle Scholar
  • Xu S. H., Kumar S. P. R., Mirchandani P. B. Scheduling stochastic jobs with increasing hazard rate on identical parallel machines. Comput. Oper. Res. (1992) 19:535–544CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.