Asymptotic Mean and Variance of Electric Power Generation System Production Costs via Recursive Computation of the Fundamental Matrix of a Markov Chain

Published Online:https://doi.org/10.1287/opre.47.5.703

References

  • Baleriaux H., Jamoulle E., Guertechin Fr. Linard de. Simulation de l'exploitation d'un parc de machines thermiques de production d'electricite couple a des stations de pompage. Revue E (1967) 5(edition SRBE):225–245Google Scholar
  • Bell E. Discussion of the paper by M. Mazumdar and C. K. Yin. IEEE Trans. Power Syst. (1990) 4:667Google Scholar
  • Breipohl A. M., Lee F. N., Zhai D., Adapa R. A Gauss-Markov load model for application in risk evaluation and production simulation. IEEE Trans. Power Syst. (1992) 7:1493–1499CrossrefGoogle Scholar
  • Bloom J. A. Representing the production cost curve of a power system using the method of moments. IEEE Trans. Power Syst. (1992) 7:1370–1377CrossrefGoogle Scholar
  • Booth R. R. Power system simulation model based on probability analysis. IEEE Trans. Power Apparatus Syst. (1972) PAS-91:62–69CrossrefGoogle Scholar
  • Endrenyi J.Reliability Modeling in Electric Power Systems (1979) (John Wiley, New York) Google Scholar
  • IEEE Reliability Test SystemIEEE Trans. Power Apparatus Syst. (1979) PAS-98:2047–2054CrossrefGoogle Scholar
  • Kapoor A., Mazumdar M. Approximate computation of the variance of electric power generation system production costs. Electrical Power Energy Syst. (1996) 18:229–238CrossrefGoogle Scholar
  • Kemeny J. G., Snell J. L.Finite Markov Chains (1960) (Van Nostrand, Princeton, NJ) Google Scholar
  • Lee F. N., Lin M., Breipohl A. M. Evaluation of the variance of production cost using a stochastic outage capacity model. IEEE Trans. Power Syst. (1990) 5:1061–1067CrossrefGoogle Scholar
  • Lin M., Breipohl A. M., Lee F. N. Comparison of probabilistic production cost methods. IEEE Trans. Power Syst. (1989) 4:1326–1334CrossrefGoogle Scholar
  • Mazumdar M., Bloom J. A. Derivation of the Baleriaux formula of expected production costs based on chronological load considerations. Electrical Power Energy Sys. (1996) 18:33–36CrossrefGoogle Scholar
  • Mazumdar M., Yin C. K. Variance of power generating system production costs. IEEE Trans. Power Syst. (1989) 4:662–667CrossrefGoogle Scholar
  • Rau N. S., Necsulescu C. Probability distributions of incremental cost of production and production cost. IEEE Trans. Power Apparatus Syst. (1985) PAS-104:3493–3500CrossrefGoogle Scholar
  • Ross S. M.Introduction to Probability Models (1993) 5th ed.(Academic Press, New York) Google Scholar
  • Ryan S. M., Mazumdar M. Effect of frequency and duration of generating unit outages on distribution of system production costs. IEEE Trans. Power Syst. (1990) 5:191–197CrossrefGoogle Scholar
  • Ryan S. M., Mazumdar M. Chronological influences on the variance of electric power production costs. Oper. Res. (1992) 40(2):S284–S292LinkGoogle Scholar
  • Sager M. A., Ringlee R. J., Wood A. J. A new generation production cost program to recognize forced outages. IEEE Trans. Power Apparatus Syst. (1972) PAS-91:2114–2124CrossrefGoogle Scholar
  • Shih F. A Markov model for evaluation of electric power generation system production costs. (1995) . Ph.D. dissertation, University of Pittsburgh, Pittsburgh, PAGoogle Scholar
  • Whitt W. Asymptotic formulas for Markov processes with applications to simulation. Oper. Res. (1992) 40:279–291LinkGoogle Scholar
  • Wollenberg B. F. Discussion of the paper by Sager, Ringlee, and Wood. IEEE Trans. Power Apparatus Syst. (1972) PAS-91:2123Google Scholar
  • Wood A. J., Wollenberg B. F.Power Generation, Operation, and Control (1995) 2nd ed.(John Wiley, New York) Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.