Coordination of Production/Distribution Networks with Unbalanced Leadtimes
Published Online:1 Aug 2000https://doi.org/10.1287/opre.48.4.570.12422
References
- A survey of lower bounding methodologies for production/inventory models. Ann. Oper. Res. (1990) 26:9–28Crossref, Google Scholar
- 98%-effective lot sizing for series inventory systems with backlogging. Oper. Res. (1995) 43:335–345Link, Google Scholar
- Scheduling production/distribution networks is NP-hard. (1998) . Working Paper, Columbia Graduate School of Business, New YorkGoogle Scholar
- Simple power of two policies are close to optimal in a general class of production/distribution networks with general joint setup costs. Math. Oper. Res. (1992) 17:951–963Link, Google Scholar
- The joint replenishment problem with general joint cost structures. Oper. Res. (1992) 40:384–403Link, Google Scholar
- Efficient algorithms for finding optimal power-of-two policies for production/distribution systems with general joint setup costs. Oper. Res. (1995) 43:458–470Link, Google Scholar
- Leadtimes in production/distribution networks. (1998) . Ph.D. Dissertation, Columbia Graduate School of Business, New YorkGoogle Scholar
- User's guide for CFSQP version 2.3: a c-code for solving constrained nonlinear optimization problems. (1995) . Electrical Engineering Department and Institute for Systems Research, University of Maryland, College Park, MDGoogle Scholar
- Establishing consistent and realistic reorder intervals in production-distribution systems. Oper. Res. (1985) 33:1316–1341Link, Google Scholar
- 98%-effective lot-sizing for one-warehouse, multi-retailer, inventory systems with backlogging. Oper. Res. (1987) 35:399–404Link, Google Scholar
- , Graves S., Rinnooy Kan A., Zipkin P. Analysis of multistage production systems. Logistics of Production and Inventory, Handbooks in Operations Research and Management Science (1993) 4(Elsevier, North-Holland, Amsterdam) Crossref, Google Scholar
- 98%-effective integer-ratio lot-sizing for one-warehouse multi-retailer systems. Management Sci. (1985) 31:1416–1430Link, Google Scholar
- A 98%-effective lot-sizing rule for a multi-product, multi-stage production/inventory system. Math. Oper. Res. (1986) 11:699–727Link, Google Scholar
- 94%-effective lot-sizing: user-oriented algorithms and proofs. (1993) . Working Paper, Linköping Institute of Technology, Linköping, SwedenGoogle Scholar
- Minimum concave cost solution of Leontief substitution models of multi-facility inventory systems. Oper. Res. (1969) 17:262–299Link, Google Scholar
- Replenishment strategies for production distribution networks with general joint setup costs. (1987) . Ph.D. Dissertation, Columbia University, New YorkGoogle Scholar

