Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems

References

  • Avram F., Bertsimas D., Ricard M., Kelly F. P., Williams R. Optimization of multiclass fluid queueing networks: a linear control approach. (1995) Proceedings of the IMA:199–234Google Scholar
  • Abate J., Choudhury G. L., Whitt W. Exponential approximations for tail probabilities in queues, I: Waiting times. Oper. Res. (1995) 43(5):885–901LinkGoogle Scholar
  • Akella R., Kumar P. R. Optimal Control of production rate in a failure prone manufacturing system. IEEE Trans. Automat. Control (1986) AC-31:116–126CrossrefGoogle Scholar
  • Bertsekas D. P.Dynamic Programming and Optimal Control (1995) I(Athena Scientific, Belmont, MA) Google Scholar
  • Bertsimas D., Paschalidis I. Ch., Tsitsiklis J. N. Asymptotic buffer overflow probabilities in multiclass multiplexers: An optimal control approach. IEEE Trans. Automat. Control (1998a) 43(3):315–335CrossrefGoogle Scholar
  • Bertsimas D., Paschalidis I. Ch., Tsitsiklis J. N. On the large deviations behaviour of acyclic networks of G/G/1 queues. The Ann. Appl. Probab. (1998b) 8(4):1027–1069CrossrefGoogle Scholar
  • Bertsimas D., Paschalidis I. Ch., Tsitsiklis J. N. Large deviations analysis of the generalized processor sharing policy. Queueing Systems (1999) 32:319–349CrossrefGoogle Scholar
  • Cramér H. Sûr un nouveau théorème-limite de la théorie des probabilités. (1938) . In Actualiés Scientifique et Industrielles, no. 736 in Colloque consacré à la théorie des probabilités, pages 5–23, Hermann, ParisGoogle Scholar
  • de Véricourt F., Karaesmen F., Dallery Y. Dynamic scheduling in a make-to-stock system: A partial characterization of optimal policies. Oper. Res. (1998) 48(5):811–819LinkGoogle Scholar
  • Dembo A., Zeitouni O.Large Deviations Techniques and Applications (1993) (Jones and Bartlett, Boston, MA) Google Scholar
  • Evans R. Inventory control of a multiproduct system with a limited production resource. Naval Res. Logist (1967) 173–184CrossrefGoogle Scholar
  • Federgruen A., Zipkin P. An inventory model with limited production capacity and uncertain demands I. The average cost criterion. Math. Oper. Res. (1986) 11(2):193–207LinkGoogle Scholar
  • Gavish B., Graves S. A one-product production/inventory problem under continuous review policy. Oper. Res. (1980) 28:1228–1236LinkGoogle Scholar
  • Glasserman P. Allocating production capacity among multiple products. Oper. Res. (1996) 44(5):724–734LinkGoogle Scholar
  • Glasserman P. Bounds and asymptotics for planning critical safety stocks. Oper. Res. (1997) 45(2):244–257LinkGoogle Scholar
  • Glasserman P., Wang Y. Fill-rate bottlenecks in production-inventory networks. (1998) . Working paperGoogle Scholar
  • Glynn P. W., Whitt W. Logarithmic asymptotics for steady-state tail probabilities in a single-server queue. J. Appl. Probab. (1994) 31A:131–156CrossrefGoogle Scholar
  • Ha A.Y. Optimal dynamic scheduling policy for a make-to-stock production system. Oper. Res. (1997) 45(1):42–53LinkGoogle Scholar
  • Krämer W., Langenbach-Belz M. Approximate formulae for the delay in the queueing system GI/G/1. (1976) Proceedings 8th International Teletraffic CongressMelbourneGoogle Scholar
  • Kapuscinski R., Tayur S. R., Tayur S. R., Ganeshan R., Magazine M. Optimal policies and simulation based optimization for capacitated production inventory systems. Quantitative Models for Supply Chain Management (1999) (Kluwer, The Netherlands) 7–40CrossrefGoogle Scholar
  • Meyn S. P. Stability and optimization of queueing networks and their fluid models. (1996) Proceedings of the Summer Seminar on The Mathematics of Stochastic Manufacturing SystemsWilliamsburg, VA:17–21Google Scholar
  • Paschalidis I. Ch. Large deviations in high speed communication networks. (1996) (Ph.D. Thesis, Massachusetts Institute of Technology, Cambridge, MA) Google Scholar
  • Paschalidis I. Ch. A multiclass queue under the generalized longest queue first policy: Bounds on the overflow probabilities. (1998) . Unpublished manuscriptGoogle Scholar
  • Peña Perez A., Zipkin P. Dynamic scheduling rules for a multiproduct make-to-stock queue. Oper. Res. (1997) 45(6):919–930LinkGoogle Scholar
  • Rockafellar R. T.Convex Analysis (1970) (Princeton University Press, Princeton, NJ) CrossrefGoogle Scholar
  • Sobel M. The optimality of full-service policies. Oper. Res. (1982) 30:636–649LinkGoogle Scholar
  • Spearman M. L., Zhang R. Q. Optimal lead time policies. Management Sci. (1999) 45(2):290–295LinkGoogle Scholar
  • Tijms H. C.Stochastic Modelling and Analysis: A Computational Approach (1986) (Wiley, New York) Google Scholar
  • Veatch M. H., Wein L. M. Scheduling a make-to-stock queue: Index policies and hedging points. Oper. Res. (1996) 44(4):643–647LinkGoogle Scholar
  • Wein L. M. Dynamic scheduling of a multiclass make-to-stock queue. Oper. Res. (1992) 40:724–735LinkGoogle Scholar
  • Zheng Y.-S., Zipkin P. A queueing model to analyze the value of centralized inventory information. Oper. Res. (1990) 38(2):296–307LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.