Improving Repetitive Manufacturing Systems: Model and Insights

References

  • Bowman R. A., Muckstadt J. A. Stochastic analysis of cyclic schedules. Oper. Res. (1993) 41:947–958LinkGoogle Scholar
  • Box G., Jenkins G., Reinsel G.Time Series Analysis: Forecasting and Control (1994) 3rd ed.(Prentice Hall, NY)Google Scholar
  • Bylinsky G. The digital factory. Fortune (1994) November 14):92–110Google Scholar
  • Coleman B. J., Vaghefi M. R. Hiejunka (?): A key to the Toyota production system. Production and Inventory Management J. (1994) 35:31–35Google Scholar
  • Cruickshanks A., Drescher R., Graves S. A study of production smoothing in a job shop environment. Management Sci. (1984) 30:368–380LinkGoogle Scholar
  • Denardo E. V., Tang C. S. Linear control of a Markov production system. Oper. Res. (1992) 40:259–278LinkGoogle Scholar
  • Duffin R. J., Peterson E. L., Zener C.Geometric Programming (1967) (Wiley, NY)Google Scholar
  • Eppen G., Martin K. Determining safety stock in the presence of stochastic lead time demand. Management Sci. (1988) 34:1380–1390LinkGoogle Scholar
  • Graves S. A tactical planning model for a job shop. Oper. Res. (1986) 34:522–533LinkGoogle Scholar
  • Graves S. Safety stocks in manufacturing systems. J. Manufacturing Oper. Management (1988) 1:67–101Google Scholar
  • Graves S. A single item inventory model for a non-stationary demand process. Manufacturing & Service Oper. Management (1999) 1:50–61LinkGoogle Scholar
  • Mishina K. Toyota Motor Manufacturing. (1992) . U.S.A., Inc. HBS Case N1-693-019Google Scholar
  • Monden Y.Toyota Production System (1983) (Institute of Industrial Engineers, Norcross, GA) Google Scholar
  • Morris B. The brand's the thing. Fortune (1996) March 4):72–86Google Scholar
  • Park P. S. Uniform plant loading through level production. Production and Inventory Management J. (1993) 34:12–17Google Scholar
  • Tang C. S. The impact of uncertainty on a production line. Management Sci. (1990) 36:1518–1531LinkGoogle Scholar
  • Webster S., Weng K. Analysis of a repetitive manufacturing system. (1998) . Working PaperGoogle Scholar
  • Weng K. Managing production with flexible capacity deployment for serial multistage manufacturing systems. Euro. J. Oper. Res. (1998) 109:587–598CrossrefGoogle Scholar
  • Womack J., Jones D., Roos D.The Machine that Changed the World (1990) (Harper Perennial, New York) Google Scholar
  • Yano C. A., Lee H. L. Lot sizing with random yields: a review. Oper. Res. (1995) 43:311–334LinkGoogle Scholar
  • Zhang H., Graves S. C. Cyclic scheduling in a stochastic environment. Oper. Res. (1997) 45:894–903LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.