Optimal Lot Sizes with Geometric Production Yield and Rigid Demand

References

  • Anily S. Single-machine lot sizing with uniform yields and rigid demands: robustness of the optimal solutions. IIE Trans. (1995) 27:625–633CrossrefGoogle Scholar
  • Beja A. Optimal reject allowance with constant marginal production efficiency. Naval Res. Logist. Quart. (1977) 24:21–33CrossrefGoogle Scholar
  • Grosfeld-Nir A. Single bottleneck systems with proportional expected yields and rigid demand. Eur. J. Oper. Res. (1995) 80:297–307CrossrefGoogle Scholar
  • Grosfeld-Nir A., Gerchak Y. Production to order with random yields: single stage multiple lot sizing. IIE Trans. (1996) 28:669–676CrossrefGoogle Scholar
  • Grosfeld-Nir A., Robinson L. W. Production to order on a two machine line with random yields and rigid demand. Eur. J. Oper. Res. (1995) 80:264–276CrossrefGoogle Scholar
  • Lee H. L., Rosenblatt M. J. Simultaneous determination production cycle and inspection schedules in production systems. Management Sci. (1987) 33:1125–1136LinkGoogle Scholar
  • Levitan R. E. The optimum reject allowance problem. Management Sci. (1960) 6:172–186LinkGoogle Scholar
  • Llewellyn R. W. Order sizes for job lot manufacturing. J. Industrial Engrg. (1959) 10:176–180Google Scholar
  • Monden Y.Toyota Production System (1983) (Industrial Engineering and Management Press, Norcross, GA) Google Scholar
  • Porteus E. L. Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. (1986) 34:137–144LinkGoogle Scholar
  • Porteus E. L. Impact of inspection delay on process and inspection lot sizing. Management Sci. (1990) 36:999–1007LinkGoogle Scholar
  • Rosenblatt M. J., Lee H. L. A comparative study of continuous and periodic inspection policies in deteriorating production systems. IIE Trans. (1986a) 18:2–9CrossrefGoogle Scholar
  • Rosenblatt M. J., Lee H. L. Economic production cycles with imperfect production processes. IIE Trans. (1986b) 18:48–55CrossrefGoogle Scholar
  • White D. J. Dynamic programming and systems of uncertain duration. Management Sci. (1965) 12:37–67LinkGoogle Scholar
  • Yano C. A., Lee H. Lot sizing with random yields: a review. Oper. Res. (1995) 43:311–334LinkGoogle Scholar
  • Zhang A. X., Guu S. The multiple lot sizing problem with rigid demand and interrupted geometric yield. IIE Trans. (1998) 30:427–431CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.