A Look-Ahead Dispatching Method for Automated Guided Vehicles in Automated Port Container Terminals

Published Online:https://doi.org/10.1287/trsc.1030.0082

References

  • Anwar M. F., Nagi R. Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies. Internat. J. Production Res. (1998) 36:653–681CrossrefGoogle Scholar
  • Bilge U., Tanchoco J. M. A. AGV systems with multi-load carriers. J. Manufacturing Systems (1997) 16(3):159–173CrossrefGoogle Scholar
  • Bilge U., Ulusoy G. A time window approach to simultaneous scheduling of machines and material handling system in an FMS. Oper. Res. (1995) 43(6):1058–1070LinkGoogle Scholar
  • Bish E. K.Theoretical analysis and practical algorithms for operational problems in container terminals (1999) (Northwestern University, Evanston, IL) . Doctoral dissertationGoogle Scholar
  • Blackstone Jr., H J., Phillips D. T., Hogg G. L. A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Internat. J. Production Res. (1982) 20:27–45CrossrefGoogle Scholar
  • Co C. G., Tanchoco J. M. A. A review of research on AGVS vehicle management. Engrg. Costs Production Econom. (1991) 21:35–42CrossrefGoogle Scholar
  • Dumas Y., Desrosiers J., Solomon M. An optimal algorithm for the traveling salesman problem with time windows. Oper. Res. (1995) 43:367–371LinkGoogle Scholar
  • Durrant-Whyte H. F. An autonomous guided vehicle for cargo handling applications. Internat. J. Robotics Res. (1996) 15:407–440CrossrefGoogle Scholar
  • Egbelu P. J. Pull versus push strategy for automated guided vehicle load movement in a batch manufacturing system. J. Manufacturing Systems (1987) 6:209–221CrossrefGoogle Scholar
  • Egbelu P. J., Tanchoco J. M. A. Characterization of automatic vehicle dispatching rules. Internat. J. Production Res. (1984) 22:359–374CrossrefGoogle Scholar
  • Evans J. R., Minieka E.Optimization Algorithms for Networks and Graphs (1992) (Marcel Dekker, New York) Google Scholar
  • Evers J. J. M., Koppers S. A. J. Automated guided vehicle traffic control at a container terminal. Transportation Res. (1996) 30A(1):21–34Google Scholar
  • Franca P. M., Gendreau M., Laporte G., Muller F. M. A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times. Internat. J. Production Econom. (1996) 43:79–89CrossrefGoogle Scholar
  • Ganesharajah T., Hall N. G., Sriskandarajah C. Design and operational issues in automated guided vehicle served manufacturing systems. Ann. Oper. Res. (1998) 76(1):109–154CrossrefGoogle Scholar
  • Gendreau M., Laporte G., Guimaraes E. M. A divide and merge heuristic for the multiprocessor scheduling problem with sequence dependent setup times. Eur. J. Oper. Res. (2001) 133(1):183–189CrossrefGoogle Scholar
  • Gendreau M., Herz A., Laporte G., Stan M. A generalized insertion heuristic for the traveling salesman with time windows. Oper. Res. (1998) 43:330–335LinkGoogle Scholar
  • Hu T. C. Parallel sequencing and assembly line problems. Oper. Res. (1961) 9:841–848LinkGoogle Scholar
  • Kim C. W., Tanchoco J. M. A., Koo P. H. AGV dispatching based on workload balancing. Internat. J. Production Res. (1999) 37(17):4053–4066CrossrefGoogle Scholar
  • Klein C. M., Kim J. AGV dispatching. Internat. J. Production Res. (1996) 34:95–110CrossrefGoogle Scholar
  • Lee J., Tangjarukij M., Zhu Z. Load selecting of automated guided vehicles in flexible manufacturing systems. Internat. J. Production Res. (1996) 34(12):3383–3400CrossrefGoogle Scholar
  • Mingozzi A., Bianco L., Ricciadelli S. Dynamic programming strategies for the traveling salesman problem with time window and precedence constraints. Oper. Res. (1997) 45:365–377LinkGoogle Scholar
  • Monma C. L., Sidney J. B. Sequencing with series—Parallel precedence constraints. Math. Oper. Res. (1979) 4:215–224LinkGoogle Scholar
  • Sabuncuoglu I., Hommertzheim D. L. Dynamic dispatching algorithm for scheduling machines and automated guided vehicles in a flexible manufacturing system. Internat. J. Production Res. (1992) 30:1059–1079CrossrefGoogle Scholar
  • Taghaboni-Dutta F. A value-added approach for automated guided vehicle task assignment. J. Manufacturing Systems (1997) 16(1):24–34CrossrefGoogle Scholar
  • Van der Meer R.Operational control of internal transport (2000) (Erasmus Research Institute of Management, Rotterdam, The Netherlands) . Doctoral dissertationGoogle Scholar
  • Vis I. F. A., Koster R. de, Roodbergen K. J. Determination of the number of AGVs in a semi-automated container terminal. (1999) . Management Report 32-999, Erasmus University, Rotterdam, The NetherlandsGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.