Delay Management with Rerouting of Passengers

Published Online:https://doi.org/10.1287/trsc.1110.0375

References

  • Berger A., Hoffmann R., Lorenz U., Stiller S. Online railway delay management: Hardness, simulation, and computation. Simulation (2011) 87(7):616–629CrossrefGoogle Scholar
  • De Giovanni L., Heilporn G., Labbé M. Optimization models for the single delay management problem in public transportation. Eur. J. Oper. Res. (2008) 189(3):762–774CrossrefGoogle Scholar
  • de Vries R., de Schutter B., de Moor B. On max-algebraic models for transportation networks. Proc. Internat. Workshop on Discrete Event Systems (1998) Cagliari, Italy:457–462Google Scholar
  • Garey M., Johnson D.Computers and Intractability—A Guide to the Theory of NP-Completeness (1979) (Freeman, San Francisco) Google Scholar
  • Gatto M. On the impact of uncertainty on some optimization problems: Combinatorial aspects of delay management and robust online scheduling. (2007) . Doctoral dissertation, ETH ZürichGoogle Scholar
  • Gatto M., Jacob R., Peeters L., Schöbel A., Kratsch D. The computational complexity of delay management. Graph-Theoretic Concepts in Comput. Sci.: 31st Internat. Workshop (WG 2005) (2005) (Springer, Berlin) CrossrefGoogle Scholar
  • Gatto M., Jacob R., Peeters L., Widmayer P. On-line delay management on a single train line. Algorithmic Methods for Railway Optimization (2007) (Springer, Berlin) 306–320CrossrefGoogle Scholar
  • Ginkel A., Schöbel A. To wait or not to wait? The bicriteria delay management problem in public transportation. Transportation Sci. (2007) 41(4):527–538LinkGoogle Scholar
  • Goverde R., Brebbia C. A., Allan J., Melitt B., Sciutto G. The max-plus algebra approach to railway timetable design. Computers in Railways VI (1998) (WIT Press, Southampton, UK) Google Scholar
  • Kroon L., Huisman D., Abbink E., Fioole P.-J., Fischetti M., Maróti G., Schrijver L., Steenbeek A., Ybema R. The new Dutch timetable: The OR revolution. Interfaces (2009) 39(1):6–17LinkGoogle Scholar
  • Liebchen C. The first optimized railway timetable in practice. Transportation Sci. (2008) 42(4):420–435LinkGoogle Scholar
  • Nachtigall K. Periodic network optimization and fixed interval timetables. (1998) . Habilitation Thesis, Universität Hildesheim, Hildesheim, GermanyGoogle Scholar
  • Schachtebeck M. Delay management in public transportation: Capacities, robustness, and integration. (2010) . Doctoral dissertation, Universität Göttingen, Göttingen, GermanyGoogle Scholar
  • Schachtebeck M., Schöbel A. To wait or not to wait and who goes first? Delay management with priority decisions. Transportation Sci. (2010) 44(3):307–321LinkGoogle Scholar
  • Schöbel A. A model for the delay management problem based on mixed-integer programming. Electronic Notes Theoret. Comput. Sci. (2001) 50(1CrossrefGoogle Scholar
  • Schöbel A. Optimization in public transportation. Stop location, delay management and tariff planning from a customer-oriented point of view. Optimization and Its Applications (2006) (Springer, New York) Google Scholar
  • Schöbel A. Integer programming approaches for solving the delay management problem. Algorithmic Methods for Railway Optimization (2007) (Springer, Berlin) 145–170CrossrefGoogle Scholar
  • Schöbel A. Capacity constraints in delay management. Public Transport (2009) 1(2):135–154CrossrefGoogle Scholar
  • Suhl L., Mellouli T. Requirements for, and design of, an operations control system for railways. Computer-Aided Transit Scheduling (1999) (Springer, Berlin) 371–390CrossrefGoogle Scholar
  • Suhl L., Mellouli T., Biederbick C., Goecke J. Managing and preventing delays in railway traffic by simulation and optimization. Mathematical Methods on Optimization in Transportation Systems (2001) (Kluwer, Dordrecht, The Netherlands) 3–16CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.