Integrating Timetabling and Crew Scheduling at a Freight Railway Operator
Published Online:16 Feb 2016https://doi.org/10.1287/trsc.2015.0648
References
- (2011) Solving large scale crew scheduling problems in practice. Public Transport 3(2):149–164.Crossref, Google Scholar
- (2014) Routing and scheduling problems: Optimization using exact and heuristic methods. Doctoral thesis, Department of Economics and Business, Aarhus University, Aarhus, Denmark.Google Scholar
- (2015) Freight railway operator timetabling and engine scheduling. Eur. J. Oper. Res. 241(2):309–319.Crossref, Google Scholar
- (1999) A heuristic method for the set covering problem. Oper. Res. 47(5):730–743.Link, Google Scholar
- (2007) Passenger railway optimization. Barnhart C, Laporte G, eds. Transportation, Handbooks Oper. Res. Management Sci., Vol. 14 (North-Holland, Amsterdam), 129–187.Crossref, Google Scholar
- (2005) Dynamic aggregation of set-partitioning constraints in column generation. Oper. Res. 53(4):632–645.Link, Google Scholar
- (2004) An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems. Networks 44(3):216–229.Crossref, Google Scholar
- (2003) Models and algorithms for integration of vehicle and crew scheduling. J. Scheduling 6(1):63–85.Crossref, Google Scholar
- (2008) A crew scheduling approach for public transit enhanced with aspects from vehicle scheduling. Hickman M, Mirchandani P, Voss S, eds. Computer-Aided Systems in Public Transport, Lecture Notes Econom. Math. Systems, Vol. 600 (Springer-Verlag, Berlin Heidelberg), 25–42.Crossref, Google Scholar
- (2008) Vehicle and crew scheduling: Solving large real-world instances with an integrated approach. Hickman M, Mirchandani P, Voss S, eds. Computer-Aided Systems in Public Transport, Lecture Notes Econom. Math. Systems, Vol. 600 (Springer-Verlag, Berlin Heidelberg), 43–56.Crossref, Google Scholar
- (2007) A column generation approach for the rail crew re-scheduling problem. Eur. J. Oper. Res. 180(1):163–173.Crossref, Google Scholar
- (2005) Multiple-depot integrated vehicle and crew scheduling. Transportation Sci. 39(4):491–502.Link, Google Scholar
- (2005) Operations research in passenger railway transportation. Statistica Neerlandica 59(4):467–497.Crossref, Google Scholar
- (2012) Divide-and-price: A decomposition algorithm for solving large railway crew scheduling problems. Eur. J. Oper. Res. 219(2):214–223.Crossref, Google Scholar
- (2011) Optimizing railway crew scheduling at DB Schenker. Interfaces 41(2):109–122.Link, Google Scholar
- (2012) Multiple depot vehicle and crew scheduling with time windows for scheduled trips. Public Transport 3(3):213–244.Crossref, Google Scholar
- (2009) The new Dutch timetable: The OR revolution. Interfaces 39(1):6–17.Link, Google Scholar
- (2007) Effective search space control for large and/or complex driver scheduling problems. Ann. Oper. Res. 155(1):417–435.Crossref, Google Scholar
- (2011) Railway track allocation: Models and methods. OR Spectrum 33(4):843–883.Crossref, Google Scholar
- (2009) Branching approaches for integrated vehicle and crew scheduling. Public Transport 1(1):21–37.Crossref, Google Scholar
- (2010) Column generation with dynamic duty selection for railway crew rescheduling. Transportation Sci. 44(4):493–505.Link, Google Scholar
- (2010) The train driver recovery problem—A set partitioning based model and solution method. Comput. Oper. Res. 37(5):845–856.Crossref, Google Scholar
- (1981) An integer programming approach to scheduling. Wren A, ed. Computer Scheduling of Public Transport: Urban Passenger Vehicle and Crew Scheduling (North-Holland, Amsterdam), 269–280.Google Scholar
- (2010) A time-space network approach for the integrated vehicle- and crew-scheduling problem with multiple depots. Transportation Sci. 44(3):367–382.Link, Google Scholar
- (2012) Railway crew rescheduling with retiming. Transportation Res. Part C 20(1):95–110.Crossref, Google Scholar

