Real-Time Decision Support for Crew Assignment in Double-Ended Districts for U.S. Freight Railways

Published Online:https://doi.org/10.1287/trsc.2016.0707

References

  • Abbink E, Fischetti M, Kroon L, Timmer G, Vromans M (2005) Reinventing crew scheduling at Netherlands Railways. Interfaces 35(5):393–401.LinkGoogle Scholar
  • Balakrishnan A, Magnanti TL, Wong RT (1989) A dual-ascent procedure for large-scale uncapacitated network design. Oper. Res. 37(5):716–740.LinkGoogle Scholar
  • Barnhart C, Cohn AM, Johnson EL, Klabjan D, Nemhauser GL, Vance PH (2003) Airline crew scheduling. Hall RW, ed. Handbook of Transportation Science, 2nd ed. (Kluwer Academic Publishers, Norwell, MA), 517–560.CrossrefGoogle Scholar
  • Caprara A, Monaci M, Toth P (2001) A global method for crew planning in railway applications. Voß S, Daduna JR, eds. Computer-Aided Scheduling of Public Transport, Lecture Notes Econom. Math. Systems, Vol. 505 (Springer-Verlag, Berlin Heidelberg), 17–36.CrossrefGoogle Scholar
  • Caprara A, Toth P, Vigo D, Fischetti M (1998) Modeling and solving the crew rostering problem. Oper. Res. 46(6):820–830.LinkGoogle Scholar
  • Caprara A, Fischetti M, Toth P, Vigo D, Guida PL (1997) Algorithms for railway crew management. Math. Programming 79(1–3):125–141.CrossrefGoogle Scholar
  • Caprara A, Kroon L, Monaci M, Peeters M, Toth P (2007) Passenger railway optimization. Barnhart C, Laporte G, eds. Handbooks in Operation Research and Management Science, Vol. 14 Transportation (North-Holland, Amsterdam), 129–187.Google Scholar
  • Ernst AT, Jiang H, Krishnamoorthy M, Nott H, Sier D (2001) An integrated optimization model for train crew management. Ann. Oper. Res. 108(1–4):211–224.CrossrefGoogle Scholar
  • Freling R, Lentink RM, Wagelmans APM (2004) A decision support system for crew planning in passenger transportation using a flexible branch-and-price algorithm. Ann. Oper. Res. 127(1–4):203–222.CrossrefGoogle Scholar
  • Gopalakrishnan B, Johnson EL (2005) Airline crew scheduling: State-of-the-art. Ann. Oper. Res. 140(1):305–337.CrossrefGoogle Scholar
  • Gorman MF, Sarrafzadeh M (2000) An application of dynamic programming to crew balancing at Burlington Northern Santa Fe Railway. Internat. J. Services Tech. Management 1(2–3):174–187.CrossrefGoogle Scholar
  • IBM ILOG CPLEX (2011) IBM ILOG CPLEX Optimization Studio V12.3 documentation. http://pic.dhe.ibm.com/infocenter/cosinfoc/v12r3/index.jsp.Google Scholar
  • Jütte S, Albers M, Thonemann UW, Haase K (2011) Optimizing railway crew scheduling at DB Schenker. Interfaces 41(2):109–122.LinkGoogle Scholar
  • Şahin G, Yüceoğlu B (2011) Tactical crew planning in railways. Transportation Res. Part E 47(6):1221–1243.CrossrefGoogle Scholar
  • Surface Transportation Board (2016) Annual Report Financial Data. U.S. Department of Transportation, Washington, DC, https://www.stb.dot.gov/econdata.nsf/FinancialData?OpenView.Google Scholar
  • Vaidyanathan B, Jha KC, Ahuja RK (2007) Multicommodity network flow approach to the railroad crew-scheduling problem. IBM J. Res. Dev. 51(3):325–344.CrossrefGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.