Determining and Evaluating Alternative Line Plans in Out-of-Control Situations

Published Online:https://doi.org/10.1287/trsc.2019.0945

References

  • Argote-Cabanero J, Daganzo CF, Lynn JW (2015) Dynamic control of complex transit systems. Transportation Res. Part B: Methodological 81(November):146–160.CrossrefGoogle Scholar
  • Bartholdi JJ, Eisenstein DD (2012) A self-coördinating bus route to resist bus bunching. Transportation Res. Part B: Methodological 46(4):481–491.CrossrefGoogle Scholar
  • Berrebi SJ, Watkins KE, Laval JA (2015) A real-time bus dispatching policy to minimize passenger wait on a high frequency route. Transportation Res. Part B: Methodological 81(November):377–389.CrossrefGoogle Scholar
  • Burggraeve S, Bull SH, Vansteenwegen P, Lusby RM (2017) Integrating robust timetabling in line plan optimization for railway systems. Transportation Res. Part C: Emerging Tech. 77(April):134–160.CrossrefGoogle Scholar
  • Cacchiani V, Huisman D, Kidd MP, Kroon LG, Toth P, Veelenturf LP, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transportation Res. Part B: Methodological 63(May):15–37.CrossrefGoogle Scholar
  • Claessens MT, van Dijk NM, Zwaneveld PJ (1998) Cost optimal allocation of rail passenger lines. Eur. J. Oper. Res. 110(3):474–489.CrossrefGoogle Scholar
  • Codato G, Fischetti M (2006) Combinatorial Benders’ cuts for mixed-integer linear programming. Oper. Res. 54(4):756–766.LinkGoogle Scholar
  • Daganzo CF (2009) A headway-based approach to eliminate bus bunching: Systematic analysis and comparisons. Transportation Res. Part B: Methodological 43(10):913–921.CrossrefGoogle Scholar
  • Dekker MM, Van Lieshout RN, Ball RC, Bouman PC, Dekker SC, Dijkstra HA, Goverde RMP, Huisman D, Schaafsma AAM, Van den Akker JM (2018) A next step in disruption management: Combining operations research and complexity science. Econometric Institute Research Papers EI2018-25, Erasmus University, Rotterdam, Netherlands.Google Scholar
  • Delgado F, Munoz JC, Giesen R (2012) How much can holding and/or limiting boarding improve transit performance? Transportation Res. Part B: Methodological 46(9):1202–1217.CrossrefGoogle Scholar
  • Dessouky M, Hall R, Nowroozi A, Mourikas K (1999) Bus dispatching at timed transfer transit stations using bus tracking technology. Transportation Res. Part C: Emerging Tech. 7(4):187–208.CrossrefGoogle Scholar
  • Ghaemi N, Cats O, Goverde RMP (2017) Railway disruption management challenges and possible solution directions. Public Transport 9(1–2):343–364.CrossrefGoogle Scholar
  • Goossens JW, Van Hoesel S, Kroon LG (2004) A branch-and-cut approach for solving railway line-planning problems. Transportation Sci. 38(3):379–393.LinkGoogle Scholar
  • Jespersen-Groth J, Potthoff D, Clausen J, Huisman D, Kroon LG, Maróti G, Nielsen MN (2009) Disruption management in passenger railway transportation. Ahuja RK, Möhring RH, Zaroliagis CD, eds. Robust and Online Large-Scale Optimization (Springer, Berlin), 399–421.CrossrefGoogle Scholar
  • Kaspi M, Raviv T (2013) Service-oriented line planning and timetabling for passenger trains. Transportation Sci. 47(3):295–311.LinkGoogle Scholar
  • Kroon LG, Peeters LW, Wagenaar JC, Zuidwijk RA (2013) Flexible connections in PESP models for cyclic passenger railway timetabling. Transportation Sci. 48(1):136–154.LinkGoogle Scholar
  • Liebchen C, Möhring RH (2007) The modeling power of the periodic event scheduling problem: Railway timetables and beyond. Geraets F, Kroon LG, Schöbel A, Wagner D, Zaroliagis CD, eds. Algorithmic Methods for Railway Optimization (Springer, Berlin), 3–40.CrossrefGoogle Scholar
  • Pätzold J, Schiewe A, Schiewe P, Schöbel A (2017) Look-ahead approaches for integrated planning in public transportation. 17th Workshop Algorithmic Approaches Transportation Model., Optim., Systems. OpenAccess Series in Informatics, vol. 59 (Schloss Dagstuhl-Leibniz-Zentrum fuer Informatik, Dagstuhl, Germany), 17:1–17:16.Google Scholar
  • Peeters L (2003) Cyclic railway timetable optimization (No. EPS-2003-022-LIS). ERIM PhD Series Research in Management, Erasmus University, Rotterdam, Netherlands.Google Scholar
  • Sánchez-Martínez G, Koutsopoulos H, Wilson N (2016) Real-time holding control for high-frequency transit with dynamics. Transportation Res. Part B: Methodological 83(January):1–19.CrossrefGoogle Scholar
  • Schöbel A (2012) Line planning in public transportation: Models and methods. OR Spectrum 34(3):491–510.CrossrefGoogle Scholar
  • Schöbel A (2017) An eigenmodel for iterative line planning, timetabling and vehicle scheduling in public transportation. Transportation Res. Part C: Emerging Tech. 74(January):348–365.CrossrefGoogle Scholar
  • Serafini P, Ukovich W (1989) A mathematical model for periodic scheduling problems. SIAM J. Discrete Math. 2(4):550–581.CrossrefGoogle Scholar
  • Van Lieshout RN, Bouman PC (2018) Vehicle scheduling based on a line plan. 18th Workshop Algorithmic Approaches Transportation Model., Optim., Systems, OpenAccess Series in Informatics, vol. 65 (Schloss Dagstuhl-Leibniz-Zentrum fuer Informatik, Dagstuhl, Germany), 15:1–15:14.Google Scholar
  • Vanderbeck F, Wolsey LA (2010) Reformulation and decomposition of integer programs. Jünger M, Liebling ThM, Naddef D, Nemhauser GL, Pulleyblank WR, Reinelt G, Rinaldi G, Wolsey LA, eds. 50 Years of Integer Programming 1958–2008 (Springer, Berlin), 431–502.Google Scholar
  • Veelenturf LP, Kidd MP, Cacchiani V, Kroon LG, Toth P (2015) A railway timetable rescheduling approach for handling large-scale disruptions. Transportation Sci. 50(3):841–862.LinkGoogle Scholar
  • Veelenturf LP, Potthoff D, Huisman D, Kroon LG, Maróti G, Wagelmans APM (2014) A quasi-robust optimization approach for crew rescheduling. Transportation Sci. 50(1):204–215.LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.