Reducing Passenger Delays by Rolling Stock Rescheduling

Published Online:https://doi.org/10.1287/trsc.2019.0968

References

  • Abbink E, van den Berg B, Kroon L, Salomon M (2004) Allocation of railway rolling stock for passenger trains. Transportation Sci. 38(1):33–41.Google Scholar
  • Adenso-Díaz B, González MO, González-Torre P (1999) On-line timetable re-scheduling in regional train services. Transportation Res. Part B: Methodological 33(6):387–398.Google Scholar
  • Alfieri A, Groot R, Kroon L, Schrijver A (2006) Efficient circulation of railway rolling stock. Transportation Sci. 40(3):378–391.Google Scholar
  • Barnhart C, Johnson EL, Nemhauser GL, Savelsbergh MWP, Vance PH (1998) Branch-and-price: Column generation for solving huge integer programs. Oper. Res. 46(3):316–329.Google Scholar
  • Ben-Khedher N, Kintanar J, Queille C, Stripling W (1998) Schedule optimization at SNCF: From conception to day of departure. Interfaces 28(1):6–23.Google Scholar
  • Borndörfer R, Reuther M, Schlechte T, Waas K, Weider S (2016) Integrated optimization of rolling stock rotations for intercity railways. Transportation Sci. 50(3):863–877.Google Scholar
  • Cacchiani V, Caprara A, Toth P (2010) Solving a real-world train-unit assignment problem. Math. Programming 124(1–2):207–231.Google Scholar
  • Cacchiani V, Huisman D, Kidd M, Kroon L, Toth P, Veelenturf L, Wagenaar J (2014) An overview of recovery models and algorithms for real-time railway rescheduling. Transportation Res. Part B: Methodological 63(May):15–37.Google Scholar
  • Cadarso L, Marín Á, Maróti G (2013) Recovery of disruptions in rapid transit networks. Transportation Res. Part E: Logist. Transportation Rev. 53(July):15–33.Google Scholar
  • Dollevoet T, Huisman D, Kroon LG, Veelenturf LP, Wagenaar JC (2017) Application of an iterative framework for real-time railway rescheduling. Comput. Oper. Res. 78(February):203–217.Google Scholar
  • Fioole PJ, Kroon L, Maróti G, Schrijver A (2006) A rolling stock circulation model for combining and splitting of passenger trains. Eur. J. Oper. Res. 174(2):1281–1297.Google Scholar
  • Haahr JT, Wagenaar JC, Veelenturf LP, Kroon LG (2016) A comparison of two exact methods for passenger railway rolling stock (re)scheduling. Transportation Res. Part E: Logist. Transportation Rev. 91(July):15–32.Google Scholar
  • Jespersen-Groth J, Potthoff D, Clausen J, Huisman D, Kroon L, Maróti G, Nielsen MN (2009) Disruption management in passenger railway transportation. Ahuja RK, Möhring RH, Zaroliagis CD, eds. Robust and Online Large-Scale Optimization, Lecture Notes in Computer Science, vol. 5868 (Springer, Berlin), 399–421.Google Scholar
  • Kennisinstituut voor Mobiliteitsbeleid (2017) Mobiliteitsbeeld 2017. Accessed January 17, 2019, https://www.rijksoverheid.nl/binaries/rijksoverheid/documenten/rapporten/2017/10/23/kim-publicatie-mobiliteitsbeeld-2017/kim-publicatie-mobiliteitsbeeld-2017.pdf.Google Scholar
  • Kroon L, Huisman D (2011) Algorithmic support for railway disruption management. van Nunen J, Huijbregts P, Rietveld P, eds. Transitions Towards Sustainable Mobility (Springer, Berlin), 193–210.Google Scholar
  • Kroon L, Maróti G, Nielsen L (2015) Rescheduling of railway rolling stock with dynamic passenger flows. Transportation Sci. 49(2):165–184.Google Scholar
  • Lusby RM, Haahr JT, Larsen J, Pisinger D (2017) A branch-and-price algorithm for railway rolling stock rescheduling. Transportation Res. Part B: Methodological 99(May):228–250.Google Scholar
  • Nielsen LK (2011) Rolling stock rescheduling in passenger railways: Applications in short-term planning and in disruption management. Unpublished PhD thesis, Erasmus Research Institute of Management, Erasmus University Rotterdam, Rotterdam, Netherlands.Google Scholar
  • Peeters M, Kroon L (2008) Circulation of railway rolling stock: A branch-and-price approach. Comput. Oper. Res. 35(2):538–556.Google Scholar
  • Schrijver A (1993) Minimum circulation of railway stock. CWI Quart. 6(3):205–217.Google Scholar
  • Veelenturf LP, Potthoff D, Huisman D, Kroon LG (2012) Railway crew rescheduling with retiming. Transportation Res. Part C: Emerging Tech. 20(1):95–110.Google Scholar
  • Veelenturf LP, Kidd MP, Cacchiani V, Kroon LG, Toth P (2016) A railway timetable rescheduling approach for handling large-scale disruptions. Transportation Sci. 50(3):841–862.Google Scholar
  • Wagenaar JC, Kroon LG, Schmidt M (2017) Maintenance appointments in railway rolling stock rescheduling. Transportation Sci. 51(4):1138–1160.Google Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.