Scheduling Vehicles with Spatial Conflicts
Published Online:2 May 2022https://doi.org/10.1287/trsc.2021.1119
References
- (1993) Network Flows: Theory, Algorithms and Applications (Prentice Hall, Upper Saddle River, NJ).Google Scholar
- (2016) Time-optimal coordination of mobile robots along specified paths. Internat. Conf. Intelligent Robots Systems (IEEE, Piscataway, NJ), 5020–5026.Google Scholar
- (2017) An algorithm for supervised driving of cooperative semi-autonomous vehicles (extended). Preprint, submitted June 25, https://arxiv.org/abs/1706.08046.Google Scholar
- (2010) The airport ground movement problem: Past and current research and future directions. Proc. 4th Internat. Conf. Res. Air Transportation (ICRAT, Budapest, Hungary), 131–138.Google Scholar
- (2020) Impact of off-block time uncertainty on the control of airport surface operations. Transportation Sci. 54(4):920–943.Link, Google Scholar
- (2020) Comparative analysis of departure metering at United States and European airports. J. Air Transportation 28(3):93–104.Crossref, Google Scholar
- (2016) Control and optimization algorithms for air transportation systems. Annu. Rev. Contr. 41:39–46.Crossref, Google Scholar
- (1979) Disjunctive programming. Hammer PL, Johnson EL, Korte BH, eds. Annals of Discrete Mathematics, vol. 5. (North-Holland Publishing Company, Amsterdam), 3–51.Google Scholar
- (1999) Resource-constrained project scheduling: Notation, classification, models, and methods. Eur. J. Oper. Res. 112(1):3–41.Crossref, Google Scholar
- (2017) Maximizing the number of conflict-free aircraft using mixed-integer nonlinear programming. Comput. Oper. Res. 80:147–158.Crossref, Google Scholar
- (2016) Simulation of rail replacement bus service in oslo. Sheibani K, Nordlander TE, Montemanni R, eds. Lecture Notes in Management Science, vol. 8. (ORLAB, Canada), 16–21.Google Scholar
- European Commission. Single European sky atm research joint undertaking. https://www.sesarju.eu.Google Scholar
- (2016) The aircraft ground routing problem: Analysis of industry punctuality indicators in a sustainable perspective. European J. Oper. Res. 248(3):827–839.Crossref, Google Scholar
- (2017) Integration of aircraft ground movements and runway operations. Transp. Res., Part E Logist. Trans. Rev. 104:131–149.Crossref, Google Scholar
- (2014) Network congestion control of airport surface operations. J. Guid. Control Dyn. 37(3):933–940.Crossref, Google Scholar
- (2013) Integrated surface and departure management at airports by optimization. Modeling, Simulation and Applied Optimization (ICMSAO), 5th Internat. Conf. Model. Sinulation Appl. Optim. (IEEE, Piscataway, NJ), 1–5.Google Scholar
- (2019) Ship traffic optimization for the Kiel Canal. Oper. Res. 67(3):791–812.Google Scholar
- (2009) Optimal real-time traffic control in metro stations. Oper. Res. 57(4):1026–1039.Link, Google Scholar
- (2021) Air traffic flow management with layered workload constraints. Comput. Oper. Res. 127. https://www.sciencedirect.com/science/article/pii/S0305054820302768.Crossref, Google Scholar
- (2002) Job-shop scheduling with blocking and no-wait constraints. Eur. J. Oper. Res. 143(3):498–517.Crossref, Google Scholar
- (2017) A robust optimization approach for airport departure metering under uncertain taxi-out time predictions. Aerosp. Sci. Technol. 68:269–277.Crossref, Google Scholar
- (2011) Analysis of a surface congestion management technique at New York JFK airport. 11th AIAA Aviation Tech., Integration, and Oper. (ATIO) Conf. (AIAA, Reston, VA), 1–12.Google Scholar
- (2013) Linear Optimization and Extensions, vol. 12 (Springer-Verlag, Berlin Heidelberg, GmbH).Google Scholar
- PJ03a - 01 Consortium (2019) Solution pj.03a-03: V2 data pack, 2019. Accessed December 31, 2019, https://ec.europa.eu/research/participants/documents/downloadPublic?documentIds=080166e5c9cdfe74&appId=PPGMS.Google Scholar
- (2015) Air traffic optimization models for aircraft delay and travel time minimization in terminal control areas. Public Transp. (Berl.) 7(3):321–337.Crossref, Google Scholar
- Reynolds TG, Hansman RJ (2014) Demonstration of reduced airport congestion through pushback rate control. Transp. Res. Part A Policy Pract. 66:251–267.Crossref, Google Scholar
- SESAR Joint Undertaking (2019) SESAR Solutions Catalogue 2019. (Publication Office of the European Union, Luxembourg).Google Scholar
- SESAR Joint Undertaking (2020) Pj.03 integrated surface management. Accessed April 17, 2020, http://https:www.sesarju.eu/projects/sumo.Google Scholar
- (2001) An exact procedure for the resource-constrained weighted earliness–tardiness project scheduling problem. Ann. Oper. Res. 102(1-4):179–196.Crossref, Google Scholar
- (2009) A two-stage stochastic optimization model for air traffic conflict resolution under wind uncertainty. 2009 IEEE/AIAA 28th Digital Avionics Systems Conf. (IEEE, Piscataway, NJ), 2.E.5-1–2.E.5-13.Google Scholar

