OR Practice

Free Access
A Tire Production Scheduling System for Bridgestone/Firestone Off-The-Road

Pages:789–796

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.789

OR Chronicle

Free Access
Modeling in Performance-Enhancing Processes

Pages:797–804

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.797

Research Article

Improved Fashion Buying with Bayesian Updates

Pages:805–819

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.805

Balancing Retailer Inventories

Pages:820–830

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.820

A Branch-and-Price Algorithm for the Generalized Assignment Problem

Pages:831–841

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.831

A New and Fast Approach to Very Large Scale Integrated Sequential Circuit Test Generation

Pages:842–856

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.842

Designing a Zoned Automated Guided Vehicle System with Multiple Vehicles and Multiple Load Capacity

Pages:857–873

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.857

Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime

Pages:874–885

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.874

A Differential Game Theoretic Model for Duopolistic Competition on Design Quality

Pages:886–893

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.886

Cyclic Scheduling in a Stochastic Environment

Pages:894–903

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.894

An Inventory Problem with Two Randomly Available Suppliers

Pages:904–918

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.904

Dynamic Scheduling Rules for a Multiproduct Make-to-Stock Queue

Pages:919–930

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.919

Optimality of (s, S) Policies in Inventory Models with Markovian Demand

Pages:931–939

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.931

98%-Effective Lot-Sizing for Assembly Inventory Systems with Backlogging

Pages:940–951

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.940

Cyclic Scheduling of Identical Parts in a Robotic Cell

Pages:952–965

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.952

Equilibrium Threshold Strategies: The Case of Queues with Priorities

Pages:966–973

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.966

Lot Sizing with Randomly Graded Yields

Pages:974–989

Published Online:December 1, 1997

https://doi.org/10.1287/opre.45.6.974

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.