Scheduling Maintenance and Determining Crew Size for Stochastically Failing Equipment

Published Online:https://doi.org/10.1287/mnsc.13.2.B52

Past treatment of the single machine maintenance problem has shown that preventive maintenance may be desirable for equipment for which failures are caused at least partially by wear-out factors. In all previous treatment, however, the size of the maintenance-repair crew has been held constant and the optimal maintenance period has then been determined. This paper develops a simultaneous solution for the maintenance-repair crew size and the optimal maintenance period. The optimal maintenance period is seen to shift as the size of the maintenance-repair crew varies.

For the multi-machine maintenance problem, the sharing of the maintenance-repair crew creates a queuing system. Because of its complexity, an analytical solution of this multi-machine maintenance queuing system is not feasible. A simulation model was used to develop a set of general rules for scheduling maintenance for the multi-machine case.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.