General Planning Horizons for Production Smoothing with Deterministic Demands

II. Extensions to Overtime, Undertime, and Backlogging
Published Online:https://doi.org/10.1287/mnsc.20.7.1037

In Part I of this paper, we developed an algorithm for finding planning horizons for the deterministic production smoothing problem when all demand was required to be met from regular production, under rather general assumptions for the production, production smoothing, and holding cost functions. Here, in Part II, we develop analogous planning horizons when the model is extended to include such factors as overtime, lost sales, simple subcontracting, undertime, and backlogging. Part II depends heavily on Part I.

To avoid unnecessary tedium, all cost functions will be assumed to be stationary in Part II. Overtime, undertime, holding, and backlogging will be assumed to be convex increasing, all other costs linear and proportional. However, it is not difficult to see that the techniques of Part I can be utilized directly to cover more general cost functions. Part II concludes with a discussion of the application of our general approach to actual data.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.