A Simulation Study of Predictable Due-Dates

Published Online:https://doi.org/10.1287/mnsc.25.4.363

This paper describes a simulation study of assigning attainable or predictable due-dates in hypothetical labor and machine constrained job shop settings of varying size and structure. Several predictable due-date assignment rules are developed based on conditional estimates of individual job flow time derived from initial simulation runs. Mean lateness, mean earliness and mean missed due-dates are used as measures of shop performance to compare the various predictable due-date rules under conditions of varying dispatching rules and shop size and structure.

Results indicate that due-dates assigned based on expected job flow time and shop congestion information may provide more attainable due-dates than rules based solely upon job characteristics. In addition, better due-date performance appears to be achieved when due-date oriented dispatching rules are employed and when the shop system is not structurally complex.

INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.