Reconfiguring a Remanufacturing Line at Visteon, Mexico

References

  • Bartholdi J. J., Bunimovich L. A., Eisenstein D. Dynamics of two and three worker bucket brigade production lines. Oper. Res. (1999) 47(3):488–491LinkGoogle Scholar
  • Buzacott J. A., Shanthikumar J. G.Stochastic Models of Manufacturing Systems (1993) (Prentice Hall, Englewood Cliffs, NJ) Google Scholar
  • Carraway R. L. A dynamic programming approach to stochastic assembly line balancing. Management Sci. (1989) 35(4):459–467LinkGoogle Scholar
  • Chand S., Zheng T. A comparison of U-line and straight-line performance under stochastic processing time. Manufacturing Service Oper. Management (2001) 3(2):138–150LinkGoogle Scholar
  • Chase R. B. Strategic considerations in assembly-line selection. California Management Rev. (1975) 18(1):17–23CrossrefGoogle Scholar
  • Conway R., Maxwell W., McClain J. O., Thomas L. J. The role of work-in-process inventory in serial production. Oper. Res. (1988) 36(2):229–241LinkGoogle Scholar
  • Ferrer G. Yield information and supplier responsiveness in remanufacturing operations. Eur. J. Oper. Res. (2003) 149(3):540–556CrossrefGoogle Scholar
  • Ferrer G., Swaminathan J. Managing new and remanufactured products. (2002) . Working paper, Kenan-Flagler School, University of North Carolina, Chapel Hill, NCGoogle Scholar
  • Ferrer G., Whybark D. Material planning for a remanufacturing facility. Production Oper. Management (2001) 10(2):112–124CrossrefGoogle Scholar
  • Fleischmann M., Bloemhof-Ruwaard J., Dekker R., van der Laan E., van Nunen J. A., van Wassenhove L. N. Quantitative models for reverse logistics: A review. Eur. J. Oper. Res. (1997) 103(1):1–17CrossrefGoogle Scholar
  • Guide V. D. R. Production planning and control for remanufacturing: Industry practice and research needs. J. Oper. Management (2000) 18(4):467–483CrossrefGoogle Scholar
  • Haynsworth H. C., Lyons R. Remanufacturing by design, the missing link. Production Inventory Management J. (1987) 28(2):24–29Google Scholar
  • Hillier F. S., Boling R. W. The effects of some design factors on the efficiency of production lines with variable operation times. J. Indust. Engrg. (1966) 17(12):651–658Google Scholar
  • Hopp W. J., Spearman M. L.Factory Physics (2000) (Irwin/McGraw-Hill, New York) Google Scholar
  • Inderfuth K., de Kok A., Flapper S. Product recovery in stochastic remanufacturing systems with multiple reuse options. Eur. J. Oper. Res. (2001) 133(1):130–152CrossrefGoogle Scholar
  • Kao E. P. C. A preference order dynamic programming method for assembly line balancing. Management Sci. (1976) 22(10):1097–1104LinkGoogle Scholar
  • Ketzenberg M., Souza G., Guide V. Mixed assembly and disassembly operations for remanufacturing. Production Oper. Management. (2003) . ForthcomingGoogle Scholar
  • McConocha D., Speh T. Remarketing: Commercialization of remanufacturing technology. J. Bus. Indust. Marketing (1991) 6(1):23–37CrossrefGoogle Scholar
  • Muth E. J. The production rate of a series of work stations with variable service times. Internat. J. Production Res. (1973) 11(9):155–169CrossrefGoogle Scholar
  • Muth E. J., Alkaff A. The throughput rate of three-station production lines: A unifying solution. Internat. J. Production Res. (1987) 25(10):1405–1413CrossrefGoogle Scholar
  • Panisset B. MRP II for repair/refurbish industries. Production Inventory Management J. (1988) 29(4):12–15Google Scholar
  • Perry J. The impact of lot size and production scheduling on inventory investment in a remanufacturing environment. Production Inventory Management J. (1991) 32(3):41–45Google Scholar
  • So K. C. Optimal buffer allocation strategy for minimizing work-in-progress inventory in unpaced production lines. IIE Trans. (1997) 29(1):81–88CrossrefGoogle Scholar
  • Sprow E. The mechanics of remanufacture. Manufacturing Engrg. (1992) 108(3):38–45Google Scholar
  • Toktay L. B., Wein L. M., Zenios S. A. Inventory management of remanufacturable products. Management Sci. (2000) 46(11):1412–1426LinkGoogle Scholar
  • Van der Laan E., Salomon M., Dekker R., Van Wassenhove L. Inventory control in hybrid systems with remanufacturing. Management Sci. (1999) 45(5):733–747LinkGoogle Scholar
  • Yamashita H., Altiok T. Buffer capacity allocation for a desired throughput in production lines. IIE Trans. (1998) 30(10):883–891CrossrefGoogle Scholar
  • Zavadlav E., McClain J. O., Thomas L. J. Self-buffering, self-balancing, self-flushing production lines. Management Sci. (1996) 42(8):1151–1164LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.