Case Article—Swirltubs After-Market Product Inventory and Service Case
Published Online:24 Sep 2021https://doi.org/10.1287/ited.2021.0259ca
References
- (1993) The repair kit problem revisited. Oper. Res. 41(5):994–1006.Link, Google Scholar
- (2016) Multiple period repair kit problem with capacity considerations. J. Transportation Tech. 6(5):457–468.Google Scholar
- (2006) A major appliance manufacturer rethinks its inventory policies for service vehicles. Interfaces 36(5):407–419.Link, Google Scholar
- (1982) Note—A multiple-item inventory model with a job completion criterion. Management Sci. 28(11):1334–1337.Link, Google Scholar
- (1995) Multiple period repair kit problem with a job completion criteria: A case study. Eur. J. Oper. Res. 81:239–248.Crossref, Google Scholar
- (2005) Progistix-Solutions Inc.—The critical parts network. Accessed September 2, 2021, https://www.iveycases.com/ProductView.aspx?id=34108&CM=true&HID=152\.Google Scholar
- (1980) Optimal inventories based on job completion rate for repairs requiring multiple items. Management Sci. 26(8):849–852.Link, Google Scholar
- (2006) The multiple-job repair kit problem. Eur. J. Oper. Res. 175(2):1103–1116.Crossref, Google Scholar

