Benefits of Skill Chaining in Serial Production Lines with Cross-Trained Workers

Published Online:https://doi.org/10.1287/mnsc.1030.0166

References

  • Askin R. G., Iyer A. A comparison of scheduling philosophies for manufacturing cells. Eur. J. Oper. Res. (1993) 69:438–449CrossrefGoogle Scholar
  • Bartholdi J. J., Eisenstein D. D. A production line that balances itself. Oper. Res. (1996) 44(1):21–34LinkGoogle Scholar
  • Bartholdi J. J., Bunimovich L. A., Eisenstein D. D. Dynamics of 2- and 3-worker "bucket brigade" production lines. Oper. Res. (1999) 47(3):488–491LinkGoogle Scholar
  • Benjaafar S., Sheikhzadeh M., Gupta D. Machine sharing in manufacturing systems: Total flexibility versus chaining. Internat. J. Flexible Manufacturing Systems (1998) 10(4):351–378CrossrefGoogle Scholar
  • Berman O., Larson R., Pinker E. Scheduling workforce and workflow in a high volume factory. Management Sci. (1997) 43(2):158–172LinkGoogle Scholar
  • Bischak D. P. Performance of a manufacturing module with moving workers. IIE Trans. (1996) 28:723–733CrossrefGoogle Scholar
  • Brusco M. J., Johns T. R. Staffing a multiskilled workforce with varying levels of productivity: An analysis of cross-training policies. Decision Sci. (1998) 29(2):499–515CrossrefGoogle Scholar
  • Campbell G. M. Cross-utilization of workers whose capabilities differ. Management Sci. (1999) 45(5):722–732LinkGoogle Scholar
  • Conway R., Maxwell W., McClain J., Thomas L. J. The role of work-in-process inventory in serial production lines. Oper. Res. (1988) 36(2):229–241LinkGoogle Scholar
  • Downey B. S., Leonard M. S. Assembly line with flexible work-force. Internat. J. Production Res. (1992) 30(3):469–483CrossrefGoogle Scholar
  • Eaves B. C., Rothblum U. G. A discrete time average cost flexible manufacturing and operator scheduling model solved by deconvexification over time. Oper. Res. (1988) 36(2):242–257LinkGoogle Scholar
  • Garey M. R., Johnson D. S.Computers and Intractability (1979) (W.H. Freeman and Company, New York) Google Scholar
  • Gel E. G. S., Hopp W. J., Van Oyen M. P. Workforce agility in systems with hierarchical cross training. (2001) . Working paper, Arizona State University, Tempe, AZ.Google Scholar
  • Goldratt E. M., Cox J.The Goal: A Process of Ongoing Improvement (1992) 2nd ed.(North River Press Inc., Croton-on-Hudson, NY) Google Scholar
  • Graves S. C., Tomlin B. T. Process flexibility in supply chains. Management Sci. (2003) 49(7):907–919LinkGoogle Scholar
  • Hopp W. J., Spearman M. L.Factory Physics: Foundations of Manufacturing Management (2000) 2nd ed.(McGraw-Hill, Burr Ridge, IL) Google Scholar
  • Hopp W. J., Van Oyen M. P. Agile workforce evaluation: A framework for cross-training and coordination. IIE Trans. (2002) . Forthcoming.CrossrefGoogle Scholar
  • Jordan W. J., Graves S. C. Principles on the benefits of manufacturing process flexibility. Management Sci. (1995) 41(4):577–594LinkGoogle Scholar
  • Lee C. Y., Vairaktarakis G. L. Workforce planning in mixed model assembly systems. Oper. Res. (1997) 45(4):553–567LinkGoogle Scholar
  • Mandelbaum R., Reiman A. On pooling in queueing networks. Management Sci. (1998) 44(7):971–981LinkGoogle Scholar
  • McClain J. O., Thomas L. J., Sox C. On-the-fly line balancing with very little WIP. Internat. J. Production Econom. (1992) 27:283–289CrossrefGoogle Scholar
  • McClain J. O., Schultz K. L., Thomas L. J. Management of worksharing systems. Manufacturing Service Oper. Management (2000) 2(1):49–67LinkGoogle Scholar
  • Nemhauser G. L., Wolsey A. W.Integer and Combinatorial Optimization (1988) (John Wiley and Sons, New York) CrossrefGoogle Scholar
  • Ostolaza J., McClain J., Thomas J. The use of dynamic (state-dependent) assembly-line balancing to improve throughput. J. Manufacturing Service Oper. Management (1990) 3:105–133Google Scholar
  • Spearman M. L., Woodruff D. L., Hopp W. J. CONWIP—A pull alternative to Kanban. Internat. J. Production Res. (1990) 28(5):879–894CrossrefGoogle Scholar
  • Treleven M. A review of the dual resource constrained system research. IIE Trans. (1989) 21(3):279–287CrossrefGoogle Scholar
  • Van Oyen M. P., Gel E. G. S., Hopp W. J. Performance opportunity of workforce agility in collaborative and noncollaborative work systems. IIE Trans. (2001) 33:761–777CrossrefGoogle Scholar
  • Zavadlav E., McClain J. O., Thomas L. J. Self-buffering, self-balancing, self-flushing production lines. Management Sci. (1996) 42(8):1151–1164LinkGoogle Scholar
INFORMS site uses cookies to store information on your computer. Some are essential to make our site work; Others help us improve the user experience. By using this site, you consent to the placement of these cookies. Please read our Privacy Statement to learn more.