Shunting of Passenger Train Units in a Railway Station
Published Online:1 May 2005https://doi.org/10.1287/trsc.1030.0076
References
- Branch-and-price: Column generation for solving huge integer programs. Oper. Res. (1998) 46:316–329Link, Google Scholar
- Scheduling trams in the morning. Math. Methods Oper. Res. (2000) 49:137–148Google Scholar
- A survey of optimization models for train routing and scheduling. Transportation Sci. (1998) 32:380–404Link, Google Scholar
- The train marshalling problem. Discrete Appl. Math. (2000) 103:41–54Crossref, Google Scholar
- , Ball M. O., Magnanti T. L., Monma C. L., Nemhauser G. L. Time constrained routing and scheduling. Network Routing (1995) (North-Holland, Amsterdam, the Netherlands) 35–139Crossref, Google Scholar
- Matching arrivals to departures in the train unit shunting problem. (2003) . Master’s thesis, Erasmus University, Rotterdam, the NetherlandsGoogle Scholar
- Dispatching buses in parking depots. Transportation Sci. (2001) 35:322–330Link, Google Scholar
- Computers and Intractability: A Guide to the Theory of NP-Completeness (1979) (Freeman, New York) Google Scholar
- Fuzzy dispatching model and genetic algorithms for railyards operations. Eur. J. Oper. Res. (2000) 124:307–331Crossref, Google Scholar
- Fundamental Algorithms (1968) (Addison Wesley, Reading, MA) Google Scholar
- Routing trains through railway stations: Complexity issues. Eur. J. Oper. Res. (1997) 98:485–498Crossref, Google Scholar
- Operational car assignment at VIA Rail Canada. Transportation Res. Part B (2002) 36:755–778Crossref, Google Scholar
- , Allan J., Hill R., Brebbia C., Sciutto G., Sone S. Depot shunting scheduling using combined genetic algorithm and PERT. Proc. COMPRAIL 2000 (2000) (Wit Press, Southampton, UK) 437–446Google Scholar
- Shunting scheduling problem at railway stations. Lecture Notes Artificial Intelligence (1999) 1611:790–797Google Scholar
- Online and real-time dispatching problems. (1999) . Ph.D. thesis, Technical University, Braunschweig, GermanyGoogle Scholar
- Real-time dispatch of trams in storage yards. Ann. Oper. Res. (2000) 96:287–315Crossref, Google Scholar

